- Joined
- Feb 24, 2017
- Posts
- 385
- Reaction
- 65
- Points
- 148
kung sino po willing please.. message down po para ma message ko sa inyo ung report ko .. (.. maraming salamt po!!
We hereby recommend that the survey findings and results be implemented given that two independent survey results have been found to affirm one another so as not to cause further delay to a Government project which is both time bound and of extreme importance.
- References for translation were made to corners 8 and 11 of Lot 2597-D, Csd-031413-007222-D equivalent to corners 21 and 24 of the mother Lot - Lot 2597, Cad 350 Norzagaray CAD.
- While, reference for rotation were line 11-12 which is presented by an existing fence posts and line connecting two "P.S." which runs along line 3-4 still of Lot 2597-D, Csd-031413-007222-D.
- Analysis shows that the meets and bounds of the mother lot is in tact as well as the aggregate area notwithstanding the acquisition of Norzon of the Lot 2597-A, Csd-031413-007222-D. Thus in no way that the adjoining lots should overlap.
- Based on Engineer carlo's result, Lot 2597-B encroaches Lot 2597-A, Csd-031413- by approximately 698 sq.m. and (to name one), a certain "P.S." supposedly for corner 12 of Lot 2597-A equivalent to corner 3 of Lot 2597-B presents shortest distance of 3.55 m towards the boundary which Jessol intends to install.
- While, with the analysis made by Jessol involving approximately 230,007 sq. m. parcels of land (being the area developed by Norzon) adjoining and surroungding the subject lots hereon , the same point - certain "P.S." supposedly for corner 12 of Lot 2597-A equivalent to corner 3 of Lot 2597-B presents shortest distance of 1.89 m towards the boundary which Jessol intends to install and results to overlap area of 487.49 sq.m. as compared to Engr. carlo's aoutput of 698 sq.m.
- Thus, Engr. carlo's output somehow affirms the output of Jessol that Lot 2597-B encroaches Lot 2597-A. In fact, Engr. carlo's output which considers the mother lot of both lots shows greater area and farther linear distance of encroachment.
- Meanwhile, Norzon requires ONLY the boundary and area finalized by Jessol having considered vast area of land for Geodetic comparison and analysis.
We hope that this will help in addressing the issues and concerns brought about by the boundary conflict.
akoayaquino kailangan daw dun sa may ari ng lote nakakainis nga eh hahahahaha...
kaya nga sir eh.. ahahaha, pasensya na po, medyo na loaded lang kaya kumapit ako sa PH ahahahha.. pero ok lang sir, pag tyagaan ko po kung hanggang saan , bahala na si batman hehehhehe sensya na po...kakaiba yan......verbal explanation lang dapat yan kung tagalog
kaya nga sir eh.. ahahaha, pasensya na po, medyo na loaded lang kaya kumapit ako sa PH ahahahha.. pero ok lang sir, pag tyagaan ko po kung hanggang saan , bahala na si batman hehehhehe sensya na po...
ok naman na sir, kumbaga pinapatagalog na lang para sa report ko sa engineer namin..
G.E ka din po ba sir?..Goodluck sa GEODESY mo